Author Archives: saintlloydchurchcemetary

Russell Grevera is now an Eagle Scout – Dec 2012

Russell Grevera passed his Board of Review monday night and is now an Eagle Scout. Congratulations Russell on your accomplishment!

Posted in Calendar | 4 Comments

Stone Border being Installed around Cemetery – Nov 2012

Posted in Calendar | Leave a comment

November Workday – Nov 3, 2012

Several volunteers spent time cutting vines off of the trees and moving gravel from the pad to the pathways to prepare for the stone border installation around the Cemetery. Thanks to all the volunteers for continuing to make this site … Continue reading

Posted in Calendar | 3 Comments

What’s next in Phase 2?

The Grubb Preservation Foundation is in the processing of aggressively moving into Phase 2 of the cemetery preservation. In Phase 2 further clean up and landscaping will include a tree survey, installation of a stone border around the cemetery, restoring … Continue reading

Posted in Calendar | Leave a comment

Phase 1 complete – Oct 2012

Russell and The Grubb Preservation Foundation have completed Phase 1 of the cemetery cleanup. The site has been cleaned up dramatically; an interpretive granite marker was installed to educate the public on the cemeteries history, two benches were added, and … Continue reading

Posted in Calendar | Leave a comment

Award of Excellence from the Foundation For The Carolinas – Oct 2012

Historic Charlotte presented an Award of Excellence to the Grubb Preservation Foundation and Boy Scout Russell Grevera to honor their work on St. Lloyd Presbyterian Cemetery. ┬áThis project helps to educate individuals about Charlotte’s past and provides an open space … Continue reading

Posted in Calendar | Leave a comment

Long’s Monument Company installs Cemetery Marker – Sept 2012

Thanks to Long’s Monument Company for creating such a fantastic Marker for St Lloyd’s Presbyterian Church Cemetery. This Cemetery Marker will be enjoyed for decades to come!

Posted in Calendar | Leave a comment

Russell installing benches in the Reflection Area – Sept 2012

Posted in Calendar | Leave a comment

Valley Crest completes the installation of the gravel Pathways and Reflection Area – Sept 2012

Posted in Calendar | Leave a comment

Russell building frames for the Benches – Sept 2012

Posted in Calendar | Leave a comment